APC G5USV040P005SAIO Datový list Strana 26

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 68
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 25
34001813EN/AF - Page 26
2. Installation
Frequency converter
For TNC upstream installation, you must connect the earth-cable, See “Earth-cable connection for a TNC earthing
system”, page 23.
To access the connection terminal blocks,
see section 1.2.
1 - The earthing conductors of each UPS
must be connected to the UPS earthing plate.
2 - Connect the neutral conductor of the
Normal AC source to the neutral terminal on
terminal block (15) of UPS1.
3 - Connect the three phases of the Normal
AC source to terminal block (16).
4 - Connect terminal block (16) in UPS1 to
terminal block (16) in UPS2 using the three
conductors of the Normal AC source.
5 - Connect the neutral cable on terminal
block (15) in UPS1 to terminal block (15) in
UPS2.
6 - Connect the four conductors supplying the
load to terminal block (14).
7 - Connect terminal block (14) in UPS1 to
terminal block (14) in UPS2 using the four
load conductors.
8 - Connect the neutral on terminal block (15)
with the neutral of the supplied loads on
terminal block (14).
9 - Tie the cables down to the frame.
10 - Put the cover back in place (see section
1.2).
Do not connect anything to the three phases on the Bypass AC source terminal block (15).
To normal
AC source
To load
14
16
15
18
N L1 L2 L3
14
16
15
N
L1 L2 L3
17
18
17
370 mm
UPS 2
UPS 1
Zobrazit stránku 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 67 68

Komentáře k této Příručce

Žádné komentáře