2. Installation
Redundant parallel configuration (maximum two UPS units for Pn)
This configuration does not have an external bypass.
UPS units with common normal and Bypass AC inputs
To access the connection terminal blocks, see section 1.2.
UPS units with separate normal and Bypass AC inputs
For TNC upstream installation, you must connect the earth-cable, See “Earth-cable connection for a TNC earthing
system”, page 23.
To access the connection terminal blocks,
see section 1.2.
1 - The earthing conductors must be
connected to the earthing plate of each UPS.
2 - Connect the four conductors of the Bypass
AC source to terminal block (15) in each UPS
unit.
3 - Connect the three phases of the Normal
AC input (16) with the three phases of the
Bypass AC input (15) in each UPS unit.
4 - Connect the four conductors of the
supplied loads to terminal block (14) in UPS1.
5 - Connect terminal block (14) in UPS2 to
terminal block (14) in UPS1 using the four
load conductors.
6 - Tie the cables down to the cabinet frames.
7 - Put the covers back in place (see section
1.2).
To access the connection terminal blocks,
see section 1.2.
1 - The earthing conductors must be
connected to the earthing plate of each UPS.
2 - Connect the three phases of the Normal
AC source to terminal block (16) in each UPS
unit.
3 - Connect the four conductors of the Bypass
AC source to terminal block (15) in each UPS
unit.
4 - Connect the four conductors of the
supplied loads to terminal block (14) in UPS1.
5 - Connect terminal block (14) in UPS2 to
terminal block (14) in UPS1 using the four
load conductors.
6 - Tie the cables down to the cabinet frames.
7 - Put the covers back in place (see section
1.2).
Caution. If the two UPSs are placed side by side, connect as indicated above. In the other configurations, always make sure
that the cables between the UPSs and Bypass AC source have the same cross-section and the same length. The same is
true for the cables between the UPSs and the load.
14
16
15
17
18
14
16
15
17
18
N L1 L2 L3N L1 L2 L3L1 L2 L3
370 mm
N L1 L2 L3N L1 L2 L3L1 L2 L3
400 mm
N L1 L2 L3N L1 L2 L3L1 L2 L3
370 mm
To loadTo loadTo loadTo load
To normal / bypass
AC source
UPS 1
UPS 2
14
16
15
17
18
14
16
15
17
18
N L1 L2 L3N L1 L2 L3L1 L2 L3
370 mm
370 mm
N L1 L2 L3N L1 L2 L3L1 L2 L3
N L1 L2 L3N L1 L2 L3L1 L2 L3
To load
To bypass
AC source
To normal
AC source
UPS 1
UPS 2